A house on this valley floor sinks for one reason, and it is not the ground swelling. The sand and gravel under El Monte do not shrink in a dry summer or heave in a wet winter the way clay does. A footing drops here because water has carried the sand out from under it, a cracked clay sewer lateral, a downspout dumping at the stem wall, a lawn watered every night against the house. Jack the corner up without finding that, and it is going down again the day the pump is unhooked.
Rio Hondo El Monte Concrete was started in 2015 by Ismael Duarte after 21 years on the San Gabriel Valley crews, and he sets every pier himself. Most houses we lift went up in the post-war rush, on footings 12 inches deep with a single bar or none, poured on orchard ground nobody compacted. The pre-war houses on the old grid north of Valley Boulevard are different, wood floors on brick and concrete piers, raised from the crawl space with screw jacks.
A lift is structural work, so it is filed with the city's Building & Safety Division with an engineer's drawing of every pier and its load, and the inspector sees the brackets before they are covered. It is done under a CSLB C-8 license with liability insurance on every job, and read off a laser at every stage, because a house raised half an inch too far cracks in new places. The lift carries a written workmanship guarantee against defects in how it was built.