A footing is the strip of concrete a wall stands on, sized so the ground under it never carries more than it can hold. Here that ground is sand and rounded gravel, which takes a two-story wall with margin to spare but runs into the trench the moment a shovel leaves it. So the width and the depth come off the drawing, and the shape is held by forms rather than by the soil. Get both right and the wall above stays put, with the doors closing as they did the day the framer left.
Rio Hondo El Monte Concrete has been Ismael Duarte's since 2015, after 21 years on footing crews across the San Gabriel Valley, and he reads every drawing before the first stake goes in. Most footings we pour go under something the lot never had: a second bedroom on a 1950s cottage, a garage turned into a rental under the state's ADU rules, a patio cover whose posts stood on the slab. The house has a footing. The garage, the porch and the back wall very often do not.
Every footing is poured under a CSLB C-8 license held with the California Contractors State License Board, with liability insurance on every job. Structural work goes to Building & Safety with a drawing, the trench and steel are inspected open, and the pour waits for that signature. The California Residential Code asks a number 4 bar top and bottom here, and bolts set wet. The footing carries a written workmanship guarantee against defects in how it was built.