Valley Boulevard runs straight from our end of El Monte into Rosemead, crossing the Rio Hondo channel at the city line, and the whole town is inside 3 miles of the yard. Permits come from Building and Safety at Rosemead City Hall on Valley Boulevard, the same street, and a job in the public right of way, a drive apron or a sidewalk panel, goes to Public Works for an encroachment permit on top. We file both and meet the inspector on the day.
The I-10 cuts the city in two on an embankment, with the older blocks around Garvey Avenue and Del Mar Avenue to the south and the postwar tracts toward Mission Drive to the north. The Rubio Wash runs down through the middle, and yards backing onto it were graded to fall toward it, so a patio there is sloped to the wash side rather than to the street. Southern California Edison keeps its headquarters on Walnut Grove Avenue, and the streets around it are the widest in the city.
Rosemead was shaken hard by the 1987 Whittier Narrows earthquake, centered under this end of the valley, and a good many of the slabs we break out cracked that October and have been patched since. A replacement is poured with bar in it because a reinforced, jointed slab cracks along its joints in the next one rather than across the middle. Summer runs past 100 degrees here in July and August, so those pours start at 6 and are finished before 11.