Our yard is 4 miles south on Peck Road, the road that runs through the middle of the neighborhood, so a crew is here in 10 minutes. South Monrovia Island is unincorporated, so no city issues its permits. They come from the Los Angeles County Department of Public Works, Building and Safety Division, and the plan check is the county's, which runs on a different timetable to the city counters in Monrovia and El Monte on either side. We file it and we allow for it in the start date.
The streets between Live Oak Avenue and the Monrovia line are 1940s and 1950s houses on small lots, and with 63 in every 100 owned rather than rented the work is for people who will keep it. A lot this size with a driveway down one side, a garage at the back and often a second unit behind it has almost no ground left, so most jobs are barrowed from a truck in the street rather than chuted, and we plan the pour around that.
The washes are channeled in concrete where they pass the neighborhood, so the yards do not flood, but the ground under them is the washes' old bed and it drinks water. That is why a slab here is never the one that heaves in winter and why we skip the drain under a patio that we would lay in South El Monte. Summer is the season to watch. The gravel dries a pour from below, so from June to September we pour at first light and keep the slab wet for the first 3 days.