Your post says Covina, your street is maintained by the county, and your building permit comes from the Building and Safety Division of the Los Angeles County Department of Public Works, not from Covina City Hall. That surprises most owners in Vincent the first time they build a wall. We deal with the county on every unincorporated job we do, so the application is filed by us, and flatwork at grade on your own lot needs no permit at all.
The crew comes east on the 10 and leaves it at Azusa Avenue, which puts a truck on Vincent Avenue about twenty minutes after it leaves our yard. The streets between Azusa Avenue and the Covina line were laid out in one push, so lots are alike, the drive runs straight to a single garage, and the side yard is a gate's width. Where a mixer cannot reach the back of a lot the concrete goes through the gate by barrow, and that decides how a patio pour is crewed and timed here.
The fan slopes south toward the 10, so a Vincent yard has a natural fall and a slab graded with it drains without a drain. The water table sits far below, which is why the Santa Fe Dam basin to the north-west can be left to soak into the same gravel. The summer heat is the other constant. From June to September a slab poured after 10 in the morning sets before it can be finished, so the pump or the truck is booked for first light.